亚洲美女一级毛片|亚洲欧美综合精品一区|国产免费无码又爽又刺激|精品三级一区二区三区无码|国产无遮挡又黄又爽无遮挡|国产一区二区不卡免费观看|亚洲综合日韩中文字幕v在线|久久99精品久久久久久久不卡

      1. <small id="erxr1"><dl id="erxr1"><small id="erxr1"></small></dl></small>
        <track id="erxr1"><dl id="erxr1"><delect id="erxr1"></delect></dl></track>
        <i id="erxr1"><ins id="erxr1"></ins></i>

          <small id="erxr1"></small>
        • <small id="erxr1"><dl id="erxr1"><small id="erxr1"></small></dl></small>

          Industry information
          [intelligent manufacturing] how to make the average speed of the tile line to reach 200 m / min? 
          DATE:2016-09-23
            Page view:2109

          1, set the goal of tile line equipment: normal speed of about 90%
          Such as tile line design speed of 250 m / min, the normal target production and speed should be: 220 five m / min, 230 layer three m / min.
          2. Find the corresponding process parameters of temperature and glue physical index to match the target production speed.
          Such as the temperature range of each piece of paper and the corresponding temperature, viscosity and solid content of the glue. At present, most of the factory's temperature control is based on the operator's experience of manual control. The ability of the operator and the responsibility of the heart is very high. The temperature control of the wet part of the tile line is recommended ".
          3, optimize the order structure, improve the scheduling of single program to reduce the impact on the efficiency of production.
          4, to participate in the production of staff management assessment, to mobilize the enthusiasm of the staff involved in management
          Note: the management responsibility to the people (loss, quality, efficiency, 6S), do not eat rice pot.
          5, all the factors affecting the efficiency of records, analysis, find reasons, research solutions
          Such as: 1) stop, broken paper, paper, paper jam, fault reason, and so on, roll change time; 2) have poor quality such as quality problems of Gao Kezhong base drive fast speed or high speed; 3) wet for a single short length, the paper is not urgent, such as the length of less than 500m; 4) cadres for a single length short, continuous small orders, small orders, cadres cut long for a single slow; 5) logistics system can not keep up the speed; 6) operator and coordination ability.
          6, repeat the process, the formation of a virtuous cycle.

          【Back】
          淄博市| 南陵县| 拉孜县| 河间市| 宁南县| 当涂县| 舞阳县| 延长县| 台南县| 晴隆县| 马龙县| 黄石市| 垣曲县| 台湾省| 奉节县| 平罗县| 惠水县| 阿尔山市| 资溪县| 孟津县| 白山市| 都安| 章丘市| 石林| 沈丘县| 铜陵市| 岑巩县| 崇文区| 全州县| 罗江县| 澳门| 米易县| 绥德县| 南投市| 鹤峰县| 三穗县| 永定县| 库车县| 竹溪县| 瓮安县| 会昌县|